Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

Water treatment plant, Eindhoven, Netherlands

  • Building Type:
  • Industrial Buildings
  • Infrastructure
Fullscreen map Close Street View

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Project facts

Developer:
Waterschap De Dommel
Construction Company:
Van Boekel Bouw & Infra
Precaster:
Haitsma Beton
Delivery year:
2019
Completion year:
2020

Contact us

Wim Zwaan

Wim Zwaan

Managing Director

Peikko Benelux B.V.

Tel. +31 (0)26 384 38 66
Mob. +31 (0)6 23 80 70 05
[email protected]