In Berlin rises a new office building located at Sonnenallee. The offices are situated in three different buildings called the Warehouse, the Workshop and the Loft. The biggest building is the Warehouse with around 34 530 m² floor area. The Workshop with 2 070 m² and the Loft with 2 960 m² is standing nearby and directly at the Neukölner Schifffahrtskanal.
With DELTABEAM® Composite Beams and bolted column connections the construction company BATEG GmbH was able to assamble with high-speed. The first DELTABEAM® was delivered in October 2021. The slab above underground levels is a cast-in-situ concrete slab, the other floors with hollow-core slabs, all in combination with DELTABEAM®. In total 5 700 m DELTABEAM® were delivered.
Due to the high spans of the slab system of 7.2 m x 11.0 m, future tenants will benefit from the high flexibility of the spaces. The project is aiming for a Platinum LEED certification.