Over 15,000 cubic meters of concrete, 2,150 metric tons of steel structures, over 350,000 meters of wires for various electrical installations and 140,000 meters of tubes for heating, freezing and venting systems were used. Mitnija workers mounted 12,000 sq. m of façade slabs and 12,000 sq. m of special internal partitions as well as 12,400 sq. m of ceiling structures in cold storage areas. They equipped the logistics center with an environmentally friendly, cost-effective two-stage ammonia refrigeration system (source www.mitnija.lt).
Peikko delivered Steel structures for roof – over 1800 tonnages and all other types of Peikko connections products plus TERAJOINT® Free Movement Joints (2 660 m).