Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

City Electrical Factors (CEF) IT and Marketing Office, Durham, UK

  • Building Type:
  • Office Buildings
Fullscreen map Close Street View

For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Read more down-arrow.png

Project facts

Project size:
2100 m2
Floors:
2
Developer:
CEF Ltd
Construction Company:
PCE Ltd
Structural Designer:
Curtins
Architect:
FaulknerBrowns
Delivery year:
2016
Completion year:
2017

Contact us

Michael Scott

Michael Scott

Sales Manager, DELTABEAM® Products

Tel. +44 1325 318619
Mob. +44 755 7118470
[email protected]