Current site: Peikko Group Global (English). Do you want to change country or language?
Peikko Group Global (English)
The precast elements of Buiksloterham Plot 20E are made circular thanks to Peikko's dismountable precast connections.
The columns, walls and beams can be demounted in a later stage thanks to Peikko's bolted connections. Even Peikko's DELTABEAM® composite beams were mounted in such a way, that they can be dismounted in the future. Main contractor Vink Bouw and the erection team of Gejamont are very satisfied with working with Peikko's concrete connections.
We are excited to be part of this project as it embodies our emerging circular thinking perfectly.
Rolf Koper, Foreman, Vink BouwWim Zwaan
Managing Director
Peikko Benelux B.V.
Tel. +31 (0)26 384 38 66
Mob. +31 (0)6 23 80 70 05
[email protected]