Current site: Peikko Group Global (English). Do you want to change country or language?

Peikko Group Global (English)

Blombacka, Skara, Sweden

  • Building Type:
  • Energy Construction
Fullscreen map Close Street View

Blombacka – Peikko FATBAR® Anchors & Modvion's Laminated Wood Turbine Tower

In 2023, Peikko supplied key components to the Blombacka project in Sweden, near Skara municipality, including a Cage Rock foundation with an extended pedestal, fully manufactured in Finland. The foundation features 16 FATBAR® 64 Post-Tensioned Anchors, each 16 meters long, double-headed PSB reinforcement, along with a complete anchor cage set and formworks.

Blombacka showcases Modvion's first commercial pilot project featuring a modular laminated wood wind turbine tower with a height of 105 meters. These towers are strong, lightweight, and sustainable.

The FATBAR® Post-Tensioned Anchor is an ETA-assessed and CE-marked product, ensuring proven quality, safety, and reliability. Its compact design is optimized for material efficiency, environmental consciousness, and cost-effective installation. Additionally, the anchor simplifies risk management with easy re-tensioning, enabling hassle-free maintenance throughout the foundation's lifecycle.

Read more down-arrow.png

Project facts

Developer:
Varber Energi
Construction Company:
Modvion/ Svevia
Structural Designer:
Modvion/ Peikko
Delivery year:
2023
Completion year:
2023
Number of Turbines:
1
Turbine Manufacturer:
Modvion / Vestas
Turbine size, MW:
2MW
Hub Height, m:
150

Contact us