Current site: Peikko Group Global (English). Do you want to change country or language?
Peikko Group Global (English)
The economic optimization of the prefabricated columns of the Beşel Printing Facilities has been ensured by the moment resisting rigid connections between the beams and top end of the tall columns and by the Peikko Mechanical Connections.
With the Alacalı Construction technical team, the details of the beam-column connections, which have been developed, have been efficiently implemented on site.